CSR Activities
V.R.Engineering is continually active in serving the Environment by taking part in various CSR Activities.
We plant trees within the Factory compound to commemorate special occasions and Special visits to the Industry.
The company has a habit of planting trees in the surrounding roads and schools and continues in maintaining them to thrive well until it reaches maturity.
Solor Power Generation
- V.R.Engineering Unit 2, Irugur is powered partially by in house Green Solar Energy.
- A Solar plant of 200 kW has been installed on the rooftop of the Factory.
- Continual efforts have been made in order to make the plant operate with a lesser Carbon footprint as the time passes by.
- The installation of the Solar panels has also helped in reducing the heat levels inside the Plant.
Timeline | Emissions |
---|---|
November 2022 | 78 kg CO₂ |
December 2022 | 52 kg CO₂ |
January 2023 | 42 kg CO₂ |